Bexhill High Academy

MGP Steel Erection Ltd, were contracted to install a two storey, infill steel structure, constructed from 40ton of structural steel and 2000metres of cold rolled floor beams, within an existing school.

 

The works had to be completed within a two and a half week period, with every element of the build, materials and access equipment passing through the double doors at the front of the existing building.

This job was proudly finished early, to the immense satisfaction of the client