MGP worked with developer and specialist cladding contractor LCS to supply and install large structural cold rolled steel frame to house a cutting edge Hi-bay robotic storage and distribution facility.

The new facility was formed of five interlinked buildings that in turn required to integrate seamlessly with the existing structure.

In total there was nearly 500 tonnes of structural steel and 8 km of cold rolled, the highest columns were 16 metres tall and to create a versatile loading bay area a single 25 metre span was created using 1 metre deep beams.

All the above work was undertaken against the ticking clock of the Hi-Tech conveyor system being delivered from the Far East.